UNSW Gate 9 Project
Survey for interface design between High Street light rail station under construction and proposed Gate 9 arrival infrastructure.
Our services included:
- Detail Survey for architectural and engineering design.
- Boundary and easement fixation.
- Location of underground Sydney Water assets via potholing.
- Identification Survey for asset protection purposes.